Panel upgrade (200A) in Parker, CO
A panel upgrade (200A) in Parker, CO replaces an outdated or maxed-out panel with a new 200-amp panel, so your home can run an EV charger, a heat pump or a remodel without tripping breakers. Every circuit moves to the new panel and gets labeled, and we coordinate the permit and inspection.
What it is
What you get with a 200-amp upgrade
Your old service comes out, a new 200-amp panel and main breaker go in, and every existing circuit moves over, labeled clearly. The permit and the inspection are handled as part of the job, so the upgrade is done right, not just working.
Why this job exists
Why homes outgrow their panel
A lot of homes in Parker and the south Denver suburbs still have their original panel, sized for a house with far less electrical load than modern life actually uses. Once you're adding an EV charger, a heat pump, a hot tub, or just running more at once than the panel was built for, it starts showing up as tripped breakers or a panel that's completely full with no room for a new circuit.
We swap the whole panel for a new 200-amp one, move every existing circuit over and label it clearly, and coordinate the permit and inspection so it's done right, not just working.
The power is off for most of one day during the swap, which we schedule around you.
- Removal of the old panel
- A new 200-amp panel and main breaker
- New breakers for every existing circuit
- Labeling of every circuit
- Coordination of the permit and the inspection
Scope of work
What's included in a panel upgrade (200A)?
Every item below is part of the job, from taking the old panel out to signing off with the inspector.
Signs to watch for
When should you call for a panel upgrade?
- You are adding an EV charger, a heat pump or a hot tub
- Breakers trip when several appliances run
- The panel is full with no room for new circuits
- The home still has its original panel
- We look at your panel and your plans
- We price the upgrade and pull the permit
- The power is off for most of one day while we swap the panel
- The inspector signs off and the power stays on
What happens on the visit
What happens on the visit
Four steps, start to finish, with the outage scheduled around you.
Price and timeline
$3,200
240 minutes
Panel upgrade (200A), scheduled around you
The price covers the full swap described above. Book online and we'll set the outage window with you ahead of time.
Before you book
What affects the price?
Panel size and the number of existing circuits are the main factors, since every circuit has to be moved to the new panel and labeled. A detached garage or a subpanel elsewhere on the property adds work, and older wiring sometimes needs a few updates to meet current code during the swap.
Common questions
Panel upgrade FAQs
01How long will my power be off?
Most of one day. We schedule the outage window with you ahead of time.
02Do I need a permit for a panel upgrade?
Yes, and we handle pulling it and coordinating the inspection as part of the job.
03How long will my power be off?
Most of one day. We schedule the outage window with you ahead of time.
04Do I need a permit for a panel upgrade?
Yes, and we handle pulling it and coordinating the inspection as part of the job.
Hours
- Parker
- Castle Rock
- Lone Tree
- Highlands Ranch
Get in touch
Service area, hours and contact
Other services
Other services
Ready for 200 amps?
Book online and we'll schedule your outage window around you.
